PESHQESHIT/ALBANIA
Among HPP projects built by our subsidiary AYEN AS Energji SHA within the scope of “Albanian Fan Basin HPP Projects” with an installed capacity of 110 MW and an annual power production capacity of 380.000.000 kwh within the framework of 41-year Concession Agreement, the PESHQESHIT 3 Hydroelectric Power Plant with an installed power of 28 MW and an annual power production capacity of 118.400.000 kwh was commissioned on 4 May 2015.